Doran Companies will be constructing a 241-unit market rate apartment building at 100 8th Avenue South.

current site

Future Site of the Moline

There is currently an office/industrial building on the site. The existing building will be razed and the new apartment building will be constructed.

Proposed Building

The proposed apartment building will have a below ground resident parking area, an at grade public parking area and five stories of apartments above the parking areas.

Along Ninth Avenue there will be an outdoor pool on the second floor. This pool area will also have a putting green and bocce ball area. In addition, the building will have amenities such as a state-of-the-art fitness center with a spa, fire pits, grilling kitchens, community entertainment rooms, business center and a pet spa. Six of the units will have walk-up entrances along Eighth Avenue. The building will be a secure building with security cameras.

On the sixth floor on the Eighth Avenue side there will be a sky lounge and  deck  for  the residents. There will also be a private patio area on Eighth Avenue.

The building will have 119 one-bedrooms, 103 two-bedrooms, 13 three-bedrooms and six one­level, walk-up units, for a total of 241 units.

The Moline

Moline from ground level

Schedule

Demolition of the existing structure occurred in 2015. The project should be completed in 2017.

Contacts

  • Director of Economic Development & Planning

    952-548-6340